Inverter replacement
The inverter turns your panels’ power into electricity your home can use. It doesn’t last as long as the panels, so on an older system it’s often the first part to fail.
Starting from scratch, or have your panels been on the roof since the Feed-in Tariff days? We design and fit new solar systems for Cirencester homes, and add batteries and replace inverters on existing ones.
Free, no obligation. Or call 01452 471031.
Fully accredited & trusted
From terraces near the town centre to newer homes on the edge of town and villages like South Cerney and Siddington, most Cirencester roofs can take a worthwhile system.
We size the system to your roof and how you use electricity, not to a standard package.
Fit one with the panels, or choose an inverter that makes adding one later straightforward.
Scheduled until 31 March 2027, on panels and batteries fitted to homes.
4 kWp system, by roof direction
Generation figures from PVGIS (European Commission JRC) for a 4 kWp system at a 35° pitch with 14% system losses, using 2005–2023 weather data. Your instant quote and survey give figures for your own roof.
Lots of Cirencester homes have had panels for ten years or more. Here’s how we can help you get more from yours.
The inverter turns your panels’ power into electricity your home can use. It doesn’t last as long as the panels, so on an older system it’s often the first part to fail.
Store the surplus you’d otherwise export and use it in the evening. Most existing systems can take one, including Feed-in Tariff systems, with the right wiring.
If your generation has dropped, a check can find out why: a faulty inverter, a tripped switch, or a tree that’s grown and now shades the roof.
Got roof space left? A second set of panels can often be added. On a Feed-in Tariff system it needs to be wired so it doesn’t affect your FIT payments.
If your panels went up before the Feed-in Tariff closed in 2019, you may still be paid for every unit they generate. A battery won’t stop that, as long as it’s fitted the right way.
FIT payments are based on your generation meter, which should only count what your panels produce. The battery needs to sit where it can’t change that reading, and your FIT supplier needs to know about it.
Cirencester has four conservation areas. Rooftop solar is usually still permitted development in them, but panels can’t go on a wall or roof enclosure facing a road, and a flat-roof system needs prior approval. Listed buildings need consent first.
The national rules were updated on 27 August 2026, and until 27 August 2027 either the old or the new rules can be followed. Source: Planning Portal.
We install across the town and the villages around it, including:
Solar panel installation near Cirencester
More for Cirencester homes
About new systems and existing ones, including homes on the Feed-in Tariff.
The usual signs are a blank screen or a warning light on the inverter, an error code, or your app or generation meter showing nothing on a bright day. First check that the isolator switches next to the inverter and the solar breaker in your consumer unit are on. If they are and it still isn’t generating, the inverter is the likely culprit. Don’t open it: it carries high voltage from the panels.
Usually, yes. Ofgem requires you to declare a battery to your FIT supplier, and they’ll want a diagram showing where it sits in your system. An AC-coupled battery, fitted after your generation meter, is usually the simplest way to keep your FIT payments safe. Where the battery sits can affect deemed export payments, so it’s worth getting the design right first. See Good Energy’s guide for how one FIT supplier handles it.
Often, if you have roof space and your electrics can take it. Extra panels usually need their own inverter, or a bigger replacement one. If your current system gets Feed-in Tariff payments, the new panels must be wired so they don’t change what your FIT generation meter records, so talk to your FIT supplier before you start.
Usually not. Rooftop solar is permitted development within the size limits. Cirencester has four conservation areas: Town Centre, The Park, Gloucester Street and River Walk and South. In those, panels can’t go on a wall or roof enclosure facing a road, and a flat-roof system needs prior approval. Listed buildings need consent. You can check your address on Cotswold District Council’s conservation area maps.
Usually not just because they’re old. Panels lose a little output each year but keep working for decades, so on most older systems it’s the inverter that needs replacing, not the panels. Replacing panels makes more sense if one is damaged, or if you want more output from the same roof: newer panels produce more from the same space.
A 4 kWp system facing south in Cirencester generates about 4,050 kWh a year: around 490 kWh in June and 130 kWh in December. Facing south-east or south-west it’s about 3,820 kWh, and facing east or west about 3,220 kWh.
New solar or an upgrade: we can help in Cirencester
Get an instant quote for a new system, or call us about the one you have.
Instant Solar QuotePrefer to talk? Call us on 01452 471031